Engineering, Procurement & Construction (EPC) of Balance of Plant (BoP) of a 16MW Wind Farm (8 Wind Turbine Generators, Gamesa G114T80), including a 32km underground and overhead interconnection MV line and a 33/150kV 40/50MVA substation
Location
Astakos and Etoliko, Etolia&Akarnania, Greece
Year
2020
Client
Siemens Gamesa Renewable Energy
Project Description
EPC of BoP of a 16MW Wind Farm and a 33/150kV 40/50MVA substation
Engineering ,Design of Civil & Electrical Systems of the Wind Farm
Construction of roads and platforms
Improvement of access roads
Construction of 8 WTG foundations
Supply of MV, FO cables and earthing conductor
Construction of internal network and of 32km of overhead and underground interconnection MV line
Supply and installation of MV control building including the MV and LV equipment and materials
Testing & commissioning
Start Up
Engineering ,Design of Civil & Electrical Systems of the substation
Permitting from IPTO
Supply of Power Transformer, HV, MV and LV equipment and materials
Construction of concrete bases and steel structures for the equipment of the switchyard