Construction of electrical installations of 18MW Wind Farm Flamouria
Engineering, Procurement & Construction (EPC) of Electrical Balance of Plant (EBoP) of a 18MW Wind Farm (9 Wind Turbine Generators, Gamesa G114T93), including a 10km underground and overhead interconnection MV line
Location
Servia, Kozani, Greece
Year
2020
Client
Siemens Gamesa Renewable Energy
Project Description
EPC of EBoP of a 18MW Wind Farm
Engineering ,Design of Civil & Electrical Systems of the Wind Farm
Supply of MV, FO cables and earthing conductor
Electrical works for MV internal network and underground MV line
Construction overhead MV line
Supply and installation of MV control building including the MV and LV equipment and materials