Engineering, Procurement and Construction (ΕPC) of 33/150kV 220MVA Bekrevenikos Substation and 150kV Transmission Line, among with upgrade works at the UHV Substation of KYT Kardia
Engineering, Procurement and Construction (ΕPC) of 33/150kV 220MVA Bekrevenikos Substation and 150kV Transmission Line, among with upgrade works at the UHV Substation of KYT Kardia
Location
Bekrevenikos, Kozani, Greece
Year
2022
Client
Juwi Hellas S.A.
Project Description
EPC of 33/150kV 220MVA Bekrevenikos Substation and 150kV Transmission Line, among with upgrade works at the UHV Substation of KYT Kardia
Engineering, Design of Civil & Electrical Systems of the Substation and upgrade works at the UHV Substation of KYT Kardia
Support in Engineering, Design of Civil & Electrical Systems for the 8.5km 150kV Overhead Transmission Line and 4.5km 150kV Underground Cable
Permitting from IPTO
Supply of HV, MV and LV equipment and materials
Construction of concrete bases and steel structures for the equipment of the switchyard
Construction of the Substation Control Building
Erection of the HV equipment / Power Transformer
Construction of foundations for steel towers and 150kV Overhead Transmission Line
Supply and erection of 150kV Overhead Transmission Line steel towers