Engineering, Procurement & Construction (EPC) of Balance of Plant (BoP) of a 24MW Wind Farm (12 Wind Turbine Generators, Gamesa G90T78), including a 21km underground and overhead interconnection MV line
Location
Nafpaktos, Greece
Year
2020
Client
Siemens Gamesa Renewable Energy
Project Description
EPC of BoP of a 24MW Wind Farm
Engineering, Design of Civil & Electrical Systems of the Wind Farm
Construction of roads and platforms
Improvement of access roads
Construction of 8 WTG foundations
Supply of MV, FO cables and earthing conductor
Construction of internal network and of 21 km of overhead and underground interconnection MV line
Supply and installation of MV control building including the MV and LV equipment and materials