Project Description
ΕPC of 33/400kV 2x160/175 MVA Vermio Substation and 400kV Transmission Line
Engineering, Design of Civil & Electrical Systems of the Substation
Engineering, Design of Civil & Electrical Systems for the 7.6km 400kV Overhead Transmission Line
Permitting from IPTO
Supply of HV, MV and LV equipment and materials
Construction of concrete bases and steel structures for the equipment of the switchyard
Construction of the Substation’s Control Buildings, for Producer, IPTO and GIS Equipment
Erection of the HV equipment / Power Transformer /GIS Equipment
Construction of foundations for steel towers and 400kV Overhead Transmission Line
Supply and erection of 400kV Overhead Transmission Line steel towers
Stringing Works
Testing & commissioning
Energization of Substation and Overhead Transmission Line