Construction of three Substations 33/150 kV and 33/400kV, AIS and GIS type, for the interconnection of 1GW photovoltaic portfolio

Engineering, Procurement & Construction (EPC) of a 33/150 kV 280 MVA Substation Orycheio Amyntaio, 33/400 kV 680 MVA Substation AHS Amyntaio – KYT Amyntaio & 33/150 kV 220 MVA GIS Substation Perdikkas

Location
Amynteo, Florina and Eordaia, Kozani, Greece
Year
2023
Client
Meton Energy S.A. (RWE – PPC Renewables)

Project Description

EPC of a 33/150 kV 280 MVA Substation Orycheio Amyntaio, 33/400 kV 680 MVA Substation AHS Amyntaio – KYT Amyntaio & 33/150 kV 220 MVA GIS Substation Perdikkas

  • Engineering ,Design of Civil & Electrical Systems of the substation
  • Permitting from IPTO
  • Supply of Power Transformers, HV, MV and LV equipment and materials
  • Construction of concrete bases and steel structures for the equipment of the switchyard
  • Construction of the substation Control Building
  • Erection of the HV equipment / Power Transformer
  • Supply and erection of HV tower for the interconnection of the Substation to the grid
  • Testing & commissioning
  • Start Up

Other Projects

  • Dervenochoria, Viotia, Greece
  • 2023
  • Iberdrola Group
  • Bekrevenikos, Kozani, Greece
  • 2022
  • Juwi Hellas S.A.
  • Petroussa, Drama, Greece
  • 2022
  • Wonderplant SA