Engineering, Procurement & Construction (EPC) of Balance of Plant (BoP) of a 34MW Wind Farm (10 Wind Turbine Generators, Siemens Gamesa SG 3.4-132), including a 12 km underground interconnection MV line and a 33/150kV 75MVA substation
Location
Siatista, Kozani, Greece
Year
2020
Client
Vendavel Energiaki SA
Project Description
EPC of BoP of a 36MW Wind Farm and a 33/150kV 75MVA substation
Engineering, Design of Civil & Electrical Systems of the Wind Farm
Construction of roads and platforms
Improvement of access roads
Construction of 10 WTG foundations
Supply of MV, FO cables and earthing conductor
Construction of internal network and of 12 km of underground interconnection MV line
Testing & commissioning
Start Up
Engineering ,Design of Civil & Electrical Systems of the substation
Permitting from IPTO
Supply of HV, MV and LV equipment and materials
Construction of concrete bases and steel structures for the equipment of the switchyard
Construction of the substation Control Building
Erection of the HV equipment / Power Transformer
Supply and erection of HV towers for the interconnection of the Substation to the grid