Engineering, Procurement & Construction (EPC) of Balance of Plant (BoP) of a 39,6 MW Wind Farm (8 Wind Turbine Generators, Siemens Gamesa SG 5.0-145), including a 12 km underground interconnection MV line and a 33/150kV 90-110 MVA substation
Location
Melitis, Florina, Greece
Year
2021
Client
Visima Vendavel SA
Project Description
EPC of BoP of a 39,6 MW Wind Farm and a 33/150kV 90-110 MVA Substation
Engineering, Design of Civil & Electrical Systems of the Wind Farm
Construction of roads and platforms
Improvement of access roads
Construction of 8 WTG foundations
Supply of MV, FO cables and earthing conductor
Construction of internal network and of 12 km of underground interconnection MV line
Testing & commissioning
Start Up
Engineering, Design of Civil & Electrical Systems of the Substation
Permitting from IPTO
Supply of HV, MV and LV equipment and materials
Construction of concrete bases and steel structures for the equipment of the switchyard
Construction of the Substation Control Building
Εrection of the HV equipment / Power Transformer
Supply and erection of HV towers for the interconnection of the Substation to the grid