Construction of 6,8MW Wind Farm Agios Athanasios

Engineering, Procurement & Construction (EPC) of Balance of Plant (BoP) of a 6.8MW Wind Farm (8 Wind Turbine Generators, Gamesa G52T55), including a 15km overhead interconnection MV line

Location
Pylos, Messinia,
Greece
Year
2013
Client
Gamesa S.A

Project Description

EPC of BoP of a 6.8 MW Wind Farm including:

  • Engineering, Design of Civil & Electrical Systems of the Wind Farm
  • Construction of roads and platforms
  • Improvement of access roads
  • Construction of 8 WTG foundations
  • Supply of MV, FO cables and earthing conductor
  • Construction of internal network and of 15km of overhead interconnection MV line
  • Supply and installation of MV control building including the MV and LV equipment and materials
  • Testing & Commissioning
  • Start Up

Other Projects

  • Dervenochoria, Viotia, Greece
  • 2023
  • Iberdrola Group
  • Bekrevenikos, Kozani, Greece
  • 2022
  • Juwi Hellas S.A.
  • Petroussa, Drama, Greece
  • 2022
  • Wonderplant SA